A BTRC licence or registration is kept, not just obtained. Since February 2026 the Telecommunication Act ties renewal to performance and customer satisfaction, makes guideline KPIs cancellation grounds, requires prior consent for control changes and resets fines, while adding internal review, an appeal authority and arbitration.
BTRC compliance Bangladesh: keeping a telecom business lawful after launch
BTRC compliance Bangladesh telecom businesses must manage begins the day a licence, registration or permit is issued, not the day it comes up for renewal. Since 5 February 2026 the Bangladesh Telecommunication Act 2001 has carried rewritten conditions on ownership changes, a renewal test based on performance and customer satisfaction, cancellation grounds that include breach of key performance indicators, administrative fines of up to Tk 49 crore, and a new appeal and arbitration route, enacted by Parliament as Act No. 51 of 2026.[1] [3] Operators, ISPs, IP telephony providers and call centres that treat compliance as an annual filing exercise are the ones that receive show-cause notices.
This guide answers one question: what a telecom business must do to keep operating lawfully after launch. It builds a compliance calendar for licence conditions, reporting, payments, customer verification, service quality and records; explains how to handle changes to ownership, control, premises and services; and walks through inspections, show-cause notices, fines, suspension and cancellation, and the review and challenge routes that remain. Licence categories, fees and the 2025 to 2027 migration are covered in companion guides linked below.

Summary: Keeping a BTRC authorisation alive means paying on time, filing what the guideline and the Commission's directions require, keeping subscriber, call and complaint records, meeting quality standards, and obtaining approval before changing ownership, sites, network plans or services. When things go wrong, the Act gives BTRC inspection powers, 30-day show-cause procedures, enforcement orders, administrative fines, suspension and cancellation, and gives licensees a 15-day internal review, an appeal authority and arbitration.
Key point: Under the 2026 text, a licensee needs BTRC's prior permission for any change in share capital or ownership that partly transfers control of the licensed activity, and for any merger; nationally important licensees need the government's prior approval. An unapproved transfer of a licence, or of rights under it, is void.
At a glance
Calendar duties
Fees, revenue share, accounts, quarterly reports, quality data, records and renewal windows run on fixed cycles set by each guideline.
Prior approval
Ownership changes, mergers, new sites, network deviations and new services generally need BTRC consent first.
Inspections
Inspectors may enter, examine apparatus and records and take copies; obstruction carries up to three years or Tk 49 crore.
Show cause
Section 63 gives 30 days to answer before an enforcement order, fines up to Tk 99 crore, suspension or cancellation.
Challenge routes
Internal review within 15 days, an appeal authority for fines, arbitration and, ultimately, writ jurisdiction.
Table of Contents
BTRC compliance Bangladesh: where the obligations come from
Post-launch duties come from four layers that must be read together. The Act itself lists the conditions a licence may contain and sets the enforcement machinery. Each category has a regulatory and licensing guideline that fixes the detailed obligations. BTRC issues directions and directives that bind licensees. And the licence or registration certificate may add conditions specific to the holder.[1] Background on the Act, BTRC's structure and the 2026 reforms is in our guide to telecommunications law in Bangladesh; categories, fees and application procedure are in our BTRC licence guide.
The conditions the Act authorises
Section 37(3), replaced in 2026, allows licence conditions on compliance with the Act and regulations; extension of up to 10% of service to rural and less populated areas; payment of fees and charges; delivery of documents, accounts, estimates, returns and information as BTRC specifies; network design and maintenance in line with BTRC's transmission, signalling, switching and numbering plans; disclosure of national and international routes; non-discrimination; an information system that gives customers access to bills, prices, guidance and complaints; publication of charges; an emergency continuity plan; quality of service and technical standards; and environmental duties.[1] Every item on that list can become a compliance calendar entry.
Why guideline breaches now matter more
The 2026 version of section 46 expressly lets BTRC suspend or cancel a licence for breaching the licence obligations and key performance index provisions set out in a guideline, and for breaching BTRC's directions.[1] Guideline obligations that were once treated as soft targets are now direct cancellation grounds.
Transition does not suspend compliance
The Telecommunications Network and Licensing Policy 2025 is moving legacy categories into new layers and deregulating call-centre registration on expiry, with a soft cut-off of 30 June 2027.[4] Until a licence migrates or expires, its existing guideline continues to apply. The migration options are analysed in our guide to the telecom licensing reform.
Building a BTRC compliance calendar
A working calendar starts with the licence documents themselves: the certificate, the guideline in force on the date of issue, every BTRC letter since and any approval conditions. Each obligation is then assigned a frequency, an owner and evidence of completion.
The IPTSP guideline is a useful model because it is detailed: it sets quarterly revenue-share payments within ten days of each quarter's end, reconciled annually with any shortfall paid within 90 days of the financial year-end; monthly bank statements to BTRC by the tenth day of the following month; quarterly reports on installations, subscribers, quality of service and traffic; and an annual report within three months of the financial year-end with audited statements.[8] Other categories differ in detail, so the calendar must be built from the holder's own guideline.
Payments
Annual fees, revenue share, Social Obligation Fund contributions and bank guarantee renewals are set by each category's schedule, which BTRC can change. Where a fee or rate cannot be confirmed from the current schedule, the calendar should show the payment date and a standing instruction to check BTRC's latest figure before paying. Late payment is the commonest trigger for enforcement and an obstacle at renewal.
Reports and information
Section 84 lets BTRC direct accounting methods and periodic reports, and require any operator or licensee to deliver information or documents it needs.[2] Ad hoc requests should be logged with their deadlines like any scheduled filing. Licensees must also keep BTRC informed of the routes and systems used to transmit and receive traffic nationally and internationally.[1]
Records
Registered call centres must keep call-detail records and traffic-monitoring records for at least six months and produce them on demand.[5] IP telephony licensees keep a subscriber register and a six-month traffic and call record store at BTRC's console.[8] The Personal Data Protection Act 2026 separately requires records of personal data processing to be kept in a register for at least five years.[11] How those duties interact with privacy limits is covered in our guide to call recording and customer data.
Renewal
Ordinary licences are renewable as regulations prescribe or, absent regulations, as BTRC fixes by administrative order; nationally important licences need government approval. New section 38A requires BTRC to decide renewal within 30 days, applying its criteria and considering performance, compliance, investment, service quality and customer satisfaction.[1] Registered call centres must apply for renewal one month before expiry.[5] Category-specific renewal windows are in our licence guide. In practice, the renewal file is the compliance record of the whole term.
The table below is a starting calendar. On a phone, scroll it sideways.
| Item | Typical frequency | Legal basis | Practical note |
|---|---|---|---|
| Revenue share and annual fees | Quarterly and annual, per category schedule | Licence guideline; Act s 37(3) | Check BTRC's current rate before each payment |
| Bank account statements | Monthly (IPTSP: by the 10th) | IPTSP guideline cl 32.4 | Other categories vary |
| Operational and QoS reports | Quarterly | Guideline; Act s 84 | Keep the underlying data |
| Audited accounts and annual report | Annually (IPTSP: within 3 months of year-end) | IPTSP guideline cl 33 | Reconcile revenue share at the same time |
| CDR and traffic records | Rolling, minimum 6 months (call centres) | 2013 call centre Instructions | Produce on demand |
| Change notifications | Within 15 days (call centres) or before the change | Instructions cl 3.13; Act s 37(3) | Ownership and mergers need prior permission |
| Complaint register | Continuous; BTRC complaints on 10 and 45 working-day clocks | Act ss 59 and 59A | Track root causes |
| Renewal application | Per guideline; call centres one month before expiry | Act ss 38 and 38A | Renewal file shows the whole term's record |
Customer verification and subscriber records
Customer verification is where BTRC compliance Bangladesh obligations meet criminal enforcement. IP telephony licensees must keep a register of subscribers with name, address, national ID or business registration number, number or IP address, activation date and device identifiers, open to inspection by BTRC and law enforcement.[8] Mobile operators work under SIM-per-NID ceilings that BTRC tightened through 2025, enforcing a ten-SIM limit by the end of December 2025 and announcing a five-SIM ceiling from 1 January 2026 subject to ministry approval; investigators also found retailers unlawfully storing customers' biometric data to activate SIMs without consent.[10]
Verification failures are now priced. In July 2026 BTRC fined Robi, Banglalink, Teletalk and Grameenphone a total of Tk 8.68 crore, at Tk 10,000 per SIM, for 8,682 SIMs found in illegal international call termination, holding that operators must prevent and block illegal VoIP termination under their licensing terms, and required proof of payment within ten days.[9] Since 2026, using SIM and device registration data to surveil or harass citizens is itself an offence carrying up to two years or Tk 1.5 crore.[1] Retail and dealer contracts should therefore control both sides: verification standards and the misuse of the data collected.
Service quality, complaints and key performance indicators
Quality of service is now a renewal criterion and a cancellation ground, not merely a reporting line. Licence conditions may require the licensee to deliver quality service and meet technical standards, and the IPTSP guideline, for example, requires compliance with BTRC's QoS standards, quarterly QoS compliance reports, and lets BTRC measure quality at any time and impose penalties for shortfalls.[1] [8]
Complaint handling
Every operator providing telecom service must run enough complaint centres, publish how to reach them, record every complaint and its disposal in a register and follow BTRC's code of practice; a consumer whose complaint is not resolved may apply to BTRC, which may direct the operator and, if ignored, issue an enforcement order.[2] New section 59A requires BTRC to run a digital complaints system that acknowledges complaints within ten working days and finally disposes of them within 45 working days, and allows BTRC to impose a financial penalty where complaints are not properly resolved and customers keep suffering loss.[1]
What a regulator-ready complaints file looks like
The register should show date, channel, category, resolution, time to resolve and any refund, with monthly trend reports to management. BTRC complaints should be tracked separately with their statutory clocks. A licensee that can show falling complaint volumes and documented root-cause fixes has its best evidence for the customer-satisfaction limb of section 38A.

Changes to ownership, control, premises and services
Most avoidable enforcement arises from changes made first and notified later. BTRC compliance Bangladesh practice treats every change as a question: does it need prior approval, notice afterwards, or nothing?
Ownership and control
No licence, or right acquired under it, may be transferred in whole or part without approval under the Act; an unapproved transfer is void. Licence conditions require a licensee company, association or partnership to obtain BTRC's prior permission for any change in share capital or ownership that partly transfers control of the licensed activities, and for any merger, and BTRC will consider whether the incoming controller would itself be eligible and whether the change would disrupt the service. A nationally important licensee needs the government's prior approval for changes in share capital or ownership.[1]
Category guidelines can be stricter. The IPTSP guideline requires written approval before any change in ownership or shareholding, prior permission to transfer or issue shares, and prior permission to take any loan, and bars pledging the licence as security.[8] In a share sale, BTRC consent should be a condition precedent, and the long-stop date should allow for the regulator's timetable. Changes of directors and chief executive should be notified as each guideline requires.
Premises and sites
Registered call centres must register every location, with agent numbers and client details, before operating there; must inform BTRC of any change in the information furnished within 15 days; and need BTRC permission for any change in set-up.[5] Moving a centre uses BTRC Form CC3, and adding a centre or seats uses Form CC2; both require a valid trade licence, tax clearance, a directors list, the shareholding and a signed network diagram, and an incomplete application is summarily rejected.[6] [7] Opening, closing or moving sites, whether a centre or a point of presence, should be on the approvals calendar weeks ahead of the move date.
Services, network and equipment
Deviation from BTRC's network plans needs BTRC's approval and directions.[1] A new service cannot be charged for until its tariff is approved.[1] Letting another person use the licensed system, facilities or equipment commercially needs a BTRC permit under section 40, and breach carries up to three years or Tk 75 crore for a first offence.[1] IPTSP licensees may not subcontract any part of the service or system without prior written permission, and remain liable for agents and contractors.[8] Registered call centres need prior permission to import call-centre equipment.[5] Resale and agency structures are analysed in our guide to white-label VoIP and telecom agency.
Regulatory inspections
Inspections test BTRC compliance Bangladesh programmes in real time. BTRC may appoint suitable officers as Inspectors.[1] An Inspector may enter any place at a reasonable time where there is reason to believe unpermitted apparatus is kept or a service is being provided without a licence or in breach of its conditions; examine apparatus; examine and copy log books, reports, data, records and bills; question those in control; and, in defined circumstances, arrest a person or seize apparatus. Entry to a dwelling house needs consent or a magistrate's warrant except in special circumstances.[2] The occupier must give reasonable assistance and information.[2]
Resisting or obstructing an Inspector, or knowingly giving false or misleading information, is an offence now punishable by up to three years' imprisonment or a fine of up to Tk 49 crore.[1] An Inspector's signed certificate or report is admissible and treated as proof of the examination unless the contrary is proved, but the accused may ask the court to call the Inspector for cross-examination.[2] Call-centre registrants have also accepted unrestricted access by BTRC or law enforcement for monitoring and inspection without prior notice.[5]
An inspection protocol
- Name a duty manager and a lawyer to be called at once, on every shift.
- Check and copy the Inspector's identity and authority; record names, time and scope.
- Co-operate fully; never obstruct, delete or move equipment or data.
- Provide copies, keep a duplicate set and list everything taken or inspected.
- Answer factual questions accurately; do not speculate about legal conclusions.
- Write up the visit the same day and brief the board.

Show-cause notices, enforcement orders and fines
The enforcement provisions are the centre of BTRC compliance Bangladesh risk. They operate on short clocks, and the first response often decides the outcome.
Section 63: show cause and enforcement orders
Where a licensee or permit or certificate holder breaches the Act, regulations or a licence condition, or obtained its authorisation by giving false information, BTRC may direct it to show cause within 30 days why an enforcement order should not issue or why the licence should not be cancelled. The notice must describe the violation specifically and any corrective measures required.[2]
If no satisfactory reply is given, or the corrective steps are not taken in time, BTRC may by reasoned order impose an administrative fine, now of up to Tk 99 crore plus up to Tk 10 lakh for each day the breach continues, and in a proper case suspend or cancel the authorisation or add conditions.[1] [2]
Section 64: restraining notices
Where BTRC believes a person is acting or about to act in breach of the Act, a licence condition or a BTRC direction, it may give seven days to show cause why the person should not be restrained, and may make an interim order at once where immediate restraint is needed.[2] Breach of the resulting direction now carries an administrative fine of up to Tk 49 crore, and failure to pay it is an offence punishable by up to five years and a fine of up to Tk 99 crore.[1]
Section 65: the administrative fine procedure
Section 65, replaced in 2026, allows an administrative fine of up to Tk 49 crore for breaching the Act, rules or regulations, in addition to fines in specific provisions; compensation may still be recovered, and fines must be applied at rates consistent with the company's investment and turnover. Fines cannot be used for unlicensed operation, unlicensed radio use or uncertified equipment, which go to the criminal courts.[1]
The notice must state the facts, the matters to be considered, the procedure and the fine payable on admission. The recipient may admit and pay, admit and seek a reduction, or deny with a written statement and documents. An authorised officer then gives a reasoned decision, copied within three days. The recipient may apply to the Commission for review within 15 days, and the Commission must decide within 30 days after a hearing. Payment or discharge ends liability and is not treated as an offence; failing to pay or to appear is an offence.[1]
How to answer a notice
Diarise every deadline on receipt. Ask in writing for the documents and data the allegation rests on. Fix the problem immediately where it is real, because corrective action is what section 63 asks for. Answer each allegation separately, with evidence, and address proportionality to investment and turnover where a fine is proposed. Never let a deadline pass without a reply or a written extension request: silence is what converts a notice into an order.
Suspension and cancellation
New section 46 lets BTRC suspend or cancel any licence other than a nationally important one where it reasonably believes the licensee has become ineligible, concealed a disqualification, failed to start service on time, breached the Act, regulations, licence conditions, guideline obligations or key performance indicators, breached laws, rules or BTRC directions, or engaged in illegal activity such as unauthorised bandwidth use or illegal message or call traffic. It may also suspend or cancel in the public interest or for national security or network management. Nationally important licences may be suspended or cancelled only with the government's prior approval.[1]
The replacement section does not repeat the 2001 text's express 30-day reply notice, which survives in section 63.[2] Fairness still requires notice and a hearing before drastic action, and a cancellation without them is vulnerable on review. For registered call centres, cancellation also debars the company, its shareholders and individuals from a new registration for five years.[5]
Criminal exposure for companies and directors
Where a company contravenes the Act, section 76 deems every owner, director, manager, secretary and other officer, employee or representative to have contravened it unless they prove the violation happened without their knowledge or that they took all possible steps to prevent it.[2] Board minutes recording compliance reports, and documented responses to red flags, are therefore personal protection for directors.
All offences under the Act are now cognizable; all are bailable except the national-security offence in section 66A(1)(a); and all are compoundable on payment of applicable compensation and administrative fines. Mobile courts may punish offences listed in the schedule to the Mobile Court Act 2009.[1] Compounding is a practical exit from many disputes, but it requires the payment to be made.
Review and challenge procedures
Licensees have more routes than before 2026, and choosing the right one early matters.
- Internal review: under section 65(5), a written application to the Commission within 15 days of the officer's decision on a fine, decided within 30 days after a hearing.[1]
- Appeal authority: a person aggrieved by an administrative fine may appeal to an authority the government must constitute by rules, composed of a retired High Court Division judge, an officer not below Additional District or Sessions Judge and a Posts and Telecommunications Division officer not below Additional Secretary.[1] We have not found rules constituting it as at 31 October 2026.
- Arbitration: instead of appealing a fine, the aggrieved person may start arbitration, and any arbitrable dispute under the Act, other than a defined offence, may be resolved under the Arbitration Act 2001.[1] [12]
- Public hearings: BTRC must hold a public hearing at least every four months and record constructive issues in a published action tracker, a channel for sector-wide problems.[1]
- Writ: unlawful, unreasoned or discriminatory decisions can be challenged in the High Court Division, analysed in our guide to the BTRC licence writ.
Section 46's earlier bar on compensation claims for suspension or cancellation does not appear in the 2026 replacement text.[1] [2] Whether that opens damages claims is untested.
Step-by-step: a post-launch compliance programme
This is the programme we put in place for new licensees and registrants in their first quarter of operation.
Collect the licence file
Gather the certificate, the guideline in force at issue, every BTRC letter, direction and approval condition.
Build the calendar
List each payment, filing, report, record and renewal duty with its frequency, owner and evidence.
Map prior approvals
Identify which ownership, site, network, service, equipment and subcontracting changes need consent first.
Fix records and verification
Set retention for CDRs, subscriber registers and complaints, and audit dealer and onboarding controls.
Measure quality and complaints
Track KPIs against the guideline and BTRC complaint clocks, with monthly management reports.
Prepare for inspections
Train shift managers on an inspection protocol and keep core documents ready to copy.
Set a notice response drill
Route notices to legal on receipt, diarise 7-, 15- and 30-day clocks, and pre-approve escalation.
Report to the board
Minute quarterly compliance reports so directors can show the due diligence section 76 requires.

Mistakes to avoid in BTRC compliance Bangladesh
- Changing first, asking later: unapproved control changes and licence transfers are void, and site changes without notice breach conditions.
- Treating KPIs as aspirations: guideline performance indicators are now express cancellation grounds.
- Letting a notice deadline pass: a missed 30-day show-cause window is the fastest route to an enforcement order.
- Obstructing an inspection: even a delayed or misleading answer can be an offence carrying up to Tk 49 crore.
- Ignoring dealer conduct: SIMs misused through weak verification are fined per SIM.
- Paying fines without reading the notice: admission with a reduction request, or denial, may be available within the notice period.
- Waiting for migration: legacy guidelines bind until a licence migrates or expires.
What to watch in 2027
Four developments will change BTRC compliance Bangladesh programmes. The rules constituting the appeal authority under section 82A. The new-category guidelines and firm cut-off dates under the 2025 policy, which will reset calendars for migrating licensees.[4] Renewal regulations under section 38A setting BTRC's assessment criteria. And the compliance role that access network licensees will play for deregulated call-centre and value-added services.[4] TRW's corporate governance and compliance practice runs compliance calendars and regulator responses for telecom licensees, and our writ litigation team acts where a decision must be challenged.
Frequently asked questions
Does a merger of a licensed telecom company need BTRC consent?
How long does BTRC take to decide a renewal application?
Section 38A requires a decision within 30 days, applying BTRC's criteria and considering performance, compliance, investment, service quality and customer satisfaction. Nationally important licences also need government approval.[1]
Can BTRC inspectors enter our premises without notice?
How long do we have to answer a BTRC show-cause notice?
Under section 63, 30 days to show cause why an enforcement order or cancellation should not follow. A restraining notice under section 64 allows only seven days.[2]
What is the maximum BTRC administrative fine in 2026?
The general fine under section 65 is up to Tk 49 crore, proportionate to investment and turnover. An enforcement order under section 63 may impose up to Tk 99 crore plus up to Tk 10 lakh per day of continuing breach.[1]
What is the deadline to ask BTRC to review a fine decision?
Fifteen days from the officer's decision under section 65(4). The Commission must decide the review within 30 days after giving a hearing.[1]
Can a licence be cancelled for missing quality targets?
Yes. Since 2026, breach of the licence obligations and key performance index provisions in a guideline is an express ground for suspension or cancellation under section 46.[1]
Do we need approval to move our call centre to a new building?
Are directors personally liable for a company's telecom offences?
They can be. Section 76 deems owners, directors and officers to have contravened the Act unless they prove lack of knowledge or that they took all possible steps to prevent the breach.[2]
Can a telecom offence be compounded instead of tried?
Yes. Since 2026 all offences under the Act are compoundable on payment of the applicable compensation and administrative fines; all are cognizable, and all but the section 66A(1)(a) national-security offence are bailable.[1]
Source register
Primary legal and regulatory sources
Materials checked on 31 October 2026. Confirm the current official text before relying on any provision.
- Bangladesh Telecommunication (Amendment) Act 2026 (Act No. 51 of 2026), Bangladesh Gazette Extraordinary, 10 April 2026 (Bangla)
- Bangladesh Telecommunication Act 2001 — Authentic English Text as originally enacted (BTRC)
- Legislative and Parliamentary Affairs Division — Laws enacted in 2026 (Act No. 51 of 2026)
- Telecommunications Network and Licensing Policy 2025, Bangladesh Gazette Extraordinary, 22 September 2025
- BTRC — Instructions for Issuance of Registration Certificate for the Operation of BPO/Call Center (18 September 2013)
- BTRC — Form CC3: Registration for change of location of call centre, HCC or HCCSP centre
- BTRC — Form CC2: Registration for addition of call centre or seats under existing licence
- BTRC — Amended Regulatory and Licensing Guidelines for IP Telephony Service Provider Licence (4 June 2009)
- The Daily Star, 26 July 2026 — BTRC fines four mobile operators Tk 8.68cr over illegal VoIP SIMs
- The Financial Express, 27 December 2025 — Max SIMs under single NID cut down to five
- Personal Data Protection Act 2026 (Act No. 63 of 2026), Bangladesh Gazette Extraordinary, 10 April 2026 (Bangla)
- Bonik Barta, 24 December 2025 — Govt approves telecommunication amendment ordinance
Related TRW assistance
Move from information to a defined next step
TRW builds compliance calendars, approval strategies and inspection protocols for telecom licensees and registrants, and represents them in show-cause proceedings, fine reviews, arbitration and writ petitions. Explore our corporate governance and compliance practice and constitutional and writ litigation practice, or contact our Dhaka lawyers.