Building approval appeal in Bangladesh: the full journey, step by step
A building approval appeal in Bangladesh challenges a refusal, a condition or a cancellation of building sanction by RAJUK's Authorised Officer or Building Construction Committee under the Building Construction Act 1952. The Act allows one appeal, within thirty days, to the officer or authority prescribed by the building rules, and makes that decision final as far as the civil courts are concerned.
Beyond it, the only route is a writ petition in the High Court Division, with a further appeal by leave to the Appellate Division.
- Where it starts
- RAJUK (Authorised Officer or Building Construction Committee) for Dhaka; the equivalent authority under the 1952 Act…
- Main law
- Building Construction Act 1952 (E.B. Act II of 1953), ss.3, 3A, 3B, 8, 9, 12-15 and 18A; Rajdhani Unnayan Kartripakkha Act 2026…
- Typical duration
- RAJUK decision: about 1-4 months. Statutory appeal: about 1-6 months. Writ petition: interim orders in weeks, final…
- Who can file
- The landowner or applicant for sanction, a developer acting under a registered agreement or power of attorney, or…
Building approval appeal in Bangladesh: walk through every stage
Press next, use your arrow keys or tap a court on the map. The gold marker shows where your case is, and the green trail shows the route it has taken. For the immersive version, play it full screen.
Read every step as text
Step 1 · Before applyingCheck the land against the planning rules
Most refusals come from planning rules, not from the drawings. Before applying, the owner's architect and lawyer check the plot against the Detailed Area Plan 2022-2035, which fixes land use zones, floor area ratio and the relationship between road width and building size, and which was amended in 2023 and again in 2025. They also confirm clean title and an up-to-date mutation, the exact road width in front of the plot, and any special restrictions such as airport height zones, heritage areas, wetlands or flood flow zones.
In RAJUK's area, no authority other than RAJUK may approve construction.
Where: Lawyer's chamber · Time: 2-6 weeks · Law: s.3(1) Building Construction Act 1952; s.34(1)-(2) Rajdhani Unnayan Kartripakkha Act 2026; Detailed Area Plan 2022-2035 (gazetted 24 August 2022, as amended) · Documents: Title deeds and latest khatian, Mutation and land development tax receipts, Mouza map and DAP zoning extract, Survey plan showing road width
Tip: Get the road width measured on site. Plot-front road width drives what can be built and is a frequent ground of refusal.
Step 2 · Before applyingLand use clearance where required
Under the Dhaka building rules, approval is usually sought in stages: a land use clearance confirming that the intended use fits the plan, then the building permit itself, and finally an occupancy certificate. Large or special projects may need additional clearances, including environmental clearance from the Department of Environment and clearances from fire, traffic or aviation authorities. A refusal at the land use stage can itself be challenged, because the Act's appeal covers every order under section 3. A building approval appeal in Bangladesh therefore sometimes begins before any drawings have been considered.
Where: RAJUK: Authorised Officer / Building Construction Committee · Time: 1-2 months · Law: s.3(1) and s.8 Building Construction Act 1952; Dhaka Metropolitan Building Construction Rules 2008; s.12 Bangladesh Environment Conservation Act 1995 (larger projects) · Documents: Land use clearance application, Title and mutation documents, Location map
Tip: Ask for each stage's decision in writing. An unrecorded refusal is very hard to appeal.
Step 3 · Before applyingApply for building sanction
The application for sanction is made to the Authorised Officer or, where the Government has transferred the power, to the Building Construction Committee, in the prescribed manner and with the prescribed fee. In RAJUK's area this is done through its online construction permit system. Drawings are prepared and signed by registered professionals and must comply with the Bangladesh National Building Code, which governs structure, fire safety, building services and change of use.
Designing or approving a plan in breach of the Code is itself an offence under the 1952 Act, so professionals take the drawings seriously.
Where: RAJUK: Authorised Officer / Building Construction Committee · Time: 1-3 weeks to prepare · Law: s.8 Building Construction Act 1952; s.3(2)-(3) Building Construction Act 1952; ss.12(1)(c)-(d) and 18A Building Construction Act 1952 · Documents: Architectural and structural drawings, Soil test report, Land use clearance, Fee receipt, Professional undertakings
Tip: Keep the online submission receipt and every resubmission. The dates matter if you later complain of delay.
Step 4 · RAJUK's decisionScrutiny and decision by RAJUK
RAJUK's officials scrutinise the drawings against the rules, the Detailed Area Plan and the Building Code, and the Authorised Officer or Committee decides. Sanction can be granted subject to terms and conditions the officer thinks fit, such as setbacks, parking or reduced height. A sanction is valid for three years from its date; after that a fresh sanction is needed, though work already raised four feet above plinth level does not need fresh sanction. The decision, including any refusal or condition, is an order under section 3 and is therefore open to appeal.
Where: RAJUK: Authorised Officer / Building Construction Committee · Time: 1-4 months · Law: s.3(1) and proviso Building Construction Act 1952; s.3(1a) explanation Building Construction Act 1952 · Documents: Scrutiny observations, Sanction letter with conditions, or refusal letter
Tip: Respond to scrutiny observations quickly and in writing. Silence is often treated as abandonment.
Step 5 · RAJUK's decisionRefusal, conditions or cancellation
The applicant may be refused outright, granted sanction with conditions that make the project unviable, or later have a sanction cancelled for breach of its conditions or for incorrect statements in the application. A change of use, such as converting a residential building to commercial use, needs separate permission, and the Authorised Officer can order a use that does not conform to the Master Plan to stop, giving six months before the order takes effect. Each of these orders is final and cannot be questioned in a civil court, except through the statutory appeal.
The first step is to obtain the order in writing with its reasons.
Where: RAJUK: Authorised Officer / Building Construction Committee · Time: On decision · Law: ss.3A, 9 and 14 Building Construction Act 1952 · Documents: Refusal or cancellation order, Scrutiny notes and correspondence
Tip: Diarise thirty days from the date of the order. The appeal period runs from the order, not from when you collected it.
Step 6 · RAJUK's decisionDecide between redesigning and appealing
If the refusal rests on a clear rule, such as a floor area ratio limit or a mandatory setback, it is often faster to revise the drawings and apply again. If it rests on a disputed reading of the plan, a wrong road width, an unexplained policy or an error of fact, the statutory appeal is the right route. The lawyer and architect compare the refusal with the rules and with approvals granted on neighbouring plots. A building approval appeal in Bangladesh is strongest when it shows that the rules, read correctly, permit the design.
Where: Lawyer's chamber · Time: 1-2 weeks · Law: s.15 Building Construction Act 1952 · Documents: Copy of the order, Relevant rule and DAP extracts, Approvals for comparable plots
Tip: Do not let a resubmission run past the thirty-day appeal deadline unless you are sure you will not need the appeal.
Step 7 · Statutory appealFile the statutory appeal within thirty days
An appeal lies against every order under sections 3, 3A, 3B, 3C, 3D, 4, 5, 6 or 9 of the 1952 Act, if presented within thirty days from the date of the order, to the officer or authority prescribed by the rules. In RAJUK's area this is an appeal committee constituted under the building rules; check the current rules for the exact forum and form. The memorandum of appeal sets out each ground, annexes the order, the application, the scrutiny notes and expert opinion, and asks for an early hearing.
Where: Statutory appellate authority under s.15 (appeal committee) · Time: Filed within 30 days · Law: s.15 Building Construction Act 1952; Dhaka Metropolitan Building Construction Rules 2008 (appeal provisions) · Documents: Memorandum of appeal, Certified copy of the order, Drawings and application, Architect's or planner's opinion, Comparable approvals
Tip: Ask for a personal hearing in the memorandum itself, and attend with the architect who can explain the drawings.
Step 8 · Statutory appealAppeal hearing and final decision
The appellate authority considers the appeal, usually with input from RAJUK's planning and engineering staff, and may allow it, dismiss it, or modify the conditions. Its decision is final and cannot be called in question in any civil court. That means no civil suit, no civil appeal and no civil revision lies against the outcome. If the building approval appeal in Bangladesh succeeds, RAJUK issues or restores the sanction. If it fails, the only remaining legal route is a writ petition in the High Court Division, which reviews legality rather than design merits.
Where: Statutory appellate authority under s.15 (appeal committee) · Time: 1-6 months · Law: ss.14 and 15 Building Construction Act 1952 · Documents: Hearing notice, Written submissions, Appeal decision
Tip: If no decision comes for months, write formally asking for one. Unexplained delay can support a later writ of mandamus.
Step 9 · Writ in the High Court DivisionServe notice on RAJUK before going to court
The 2026 RAJUK Act requires one month's prior written notice before a case is filed against RAJUK under that Act or its rules, stating the cause of action, the name and address of the person and the relief sought. It is unsettled whether this reaches a writ against an order made under the 1952 Act, so the cautious course is to serve the notice and wait the month unless urgency demands immediate filing, in which case the urgency should be explained in the petition.
The notice also gives RAJUK a final chance to correct an obvious error.
Where: Lawyer's chamber · Time: 1 month · Law: s.63 Rajdhani Unnayan Kartripakkha Act 2026 · Documents: Notice under s.63 with copy of the intended petition, Proof of service
Tip: Keep proof of delivery. A missing notice is an easy preliminary objection for RAJUK.
Step 10 · Writ in the High Court DivisionFile a writ petition under Article 102
The writ petition asks the High Court Division to declare the refusal or appeal decision to have been made without lawful authority and of no legal effect, or to direct RAJUK to decide a pending application according to law. Typical grounds are misreading the plan or rules, ignoring relevant material, unequal treatment of identical plots, refusal without reasons, denial of a hearing, or unexplained delay. The petition is supported by an affidavit and annexes the full record.
Because the Act gives an appeal, the petition should show that it was used, or why it was inadequate.
Where: High Court Division · Time: 2-6 weeks to prepare and move · Law: Article 102(2)(a)(i) and (ii) Constitution of Bangladesh · Documents: Writ petition with affidavit, Refusal and appeal orders, Drawings and rules extracts, s.63 notice and proof of service
Tip: The High Court Division does not redesign buildings. Frame the case as an error of law, unfairness or irrationality.
Step 11 · Writ in the High Court DivisionRule Nisi and interim orders
At the motion hearing, a Division Bench decides whether there is an arguable case. If so, it issues a Rule Nisi calling on RAJUK to show cause, and may grant interim relief, such as directing RAJUK to dispose of the application within a set time or preserving the status quo. Interim orders that would effectively grant sanction before the final hearing are rare. RAJUK files an affidavit-in-opposition, and the petitioner can reply. The Rule then waits for a final hearing date on the bench's list.
Where: High Court Division · Time: Motion in 1-4 weeks; final hearing 1-3 years · Law: Article 102 Constitution of Bangladesh; Supreme Court of Bangladesh (High Court Division) Rules 1973 · Documents: Rule Nisi, Interim order, Affidavit-in-opposition, Affidavit-in-reply
Tip: A direction to decide the pending matter within a fixed time is often the most useful and achievable interim relief.
Step 12 · Writ in the High Court DivisionFinal hearing and judgment
At the final hearing the bench decides whether the refusal or appeal decision was lawful. It may discharge the Rule, leaving the refusal in place; make it absolute and declare the order unlawful; direct RAJUK to reconsider the application in the light of the judgment; or, more rarely, direct sanction where the law leaves only one lawful outcome. RAJUK must comply within the time set, and a deliberate failure can lead to contempt proceedings. The judgment may then be taken to the Appellate Division by the losing side.
Where: High Court Division · Time: 1-3 months after hearing · Law: Article 102(2) Constitution of Bangladesh; Article 112 Constitution (authorities to act in aid of the Supreme Court) · Documents: Judgment and order, Certified copy
Tip: Serve the certified judgment on RAJUK promptly and keep a record of the date. Compliance periods run from service.
Step 13 · Building under the sanctionBuild strictly to the sanction
Once sanction is obtained, construction must follow the approved plan and its conditions. RAJUK officials and authorised persons may enter the site after reasonable notice to check the work. If they find construction without sanction or in breach of its terms, the Authorised Officer can serve a show-cause notice giving at least seven days, during which work must stop if the notice says so.
Minor deviations can sometimes be regularised on payment of a fine of Tk 5,000-50,000 and ten times the fee; serious ones can lead to demolition orders, which have their own appeal and writ route.
Where: RAJUK: Authorised Officer / Building Construction Committee · Time: Throughout construction · Law: ss.3B(1)-(6) and 10 Building Construction Act 1952 · Documents: Sanctioned drawings on site, Construction progress records, Any show-cause notice and reply
Tip: Keep the approved drawings on site. Inspectors and police can demand to see the sanction.
Step 14 · Building under the sanctionRenew a lapsed sanction
Sanction lasts three years. If construction has not reached four feet above plinth level by then, the owner must apply for and obtain a fresh sanction before continuing. A fresh application is decided under the planning rules in force at that time, which can be stricter than when the first sanction was granted, for example after an amendment to the Detailed Area Plan. A refusal of fresh sanction is another order under section 3 and carries the same thirty-day appeal and, after it, the same writ route.
Where: RAJUK: Authorised Officer / Building Construction Committee · Time: 1-3 months · Law: s.3(1) proviso and s.3(1a) explanation Building Construction Act 1952; s.15 Building Construction Act 1952 · Documents: Original sanction, Fresh application and fee, Evidence of construction progress
Tip: Reach plinth plus four feet within the three years if you can. It protects the project against later rule changes.
Step 15 · Building under the sanctionOccupancy and change of use
On completion, the owner applies to RAJUK for an occupancy certificate under the building rules confirming that the building matches the sanction. Utilities, lenders and buyers increasingly ask for it. Using the building for a purpose other than the one sanctioned needs the Authorised Officer's or Committee's previous permission, and a refusal of that permission is appealable within thirty days like any other order.
Separately, where a use does not conform to the Master Plan, the Authorised Officer can order it to stop, giving six months before the order takes effect, though combined residential and commercial use is protected unless it undermines the zone and causes a nuisance.
Where: RAJUK: Authorised Officer / Building Construction Committee · Time: 1-3 months · Law: s.3A(1)-(2) Building Construction Act 1952; Dhaka Metropolitan Building Construction Rules 2008 · Documents: Completion report, As-built drawings, Occupancy certificate application, Change of use application
Tip: Apply for the occupancy certificate promptly. Without it, a later sale or loan can stall.
Walk through it from your side
Pick your side. The step-by-step journey above and the full-screen player will then show what you do at every stage.
Applicant (owner)
You want sanction granted, a condition removed or a cancellation reversed so the project can proceed. You must show that the rules and plan, correctly read, permit the design, first in the statutory appeal and then, if needed, in a writ on grounds of legality and fairness. Your biggest risk is missing the thirty-day appeal deadline or arguing design merits in the High Court Division.
Check the land against the planning rules
You and your architect check the plot against the Detailed Area Plan as amended: land use zone, floor area ratio, road width and any special restrictions. Your lawyer confirms clean title and up-to-date mutation, and you have the road width measured on site.
Watch outA wrong assumption about road width or zoning is a frequent cause of refusal.
Land use clearance where required
Where a land use clearance is required, you apply with the plot details and intended use, and obtain any other clearances the project needs, such as environmental, fire or aviation clearance. Ask for each decision in writing.
Watch outAn unrecorded refusal is very hard to appeal.
Apply for building sanction
You file the sanction application through RAJUK's online system with drawings signed by registered professionals, the prescribed fee and title documents. Keep the submission receipt and every resubmission.
Watch outDrawings that breach the Building Code expose the professionals and the owner to prosecution.
Scrutiny and decision by RAJUK
You respond to scrutiny observations quickly and in writing, revising drawings where the point is valid and explaining your position where it is not. Note any conditions proposed and whether the project remains viable.
Watch outLeaving observations unanswered can stall or end the application.
Refusal, conditions or cancellation
You obtain the refusal, condition or cancellation order in writing with its reasons, and diarise thirty days from the date of the order for the statutory appeal.
Watch outThe appeal period runs from the date of the order, not from when you collect it.
Decide between redesigning and appealing
You decide with your lawyer and architect whether to redesign or appeal, comparing the refusal with the rules and with approvals on neighbouring plots. If a resubmission is chosen, keep the appeal deadline in view.
Watch outA resubmission does not stop the thirty-day appeal period running.
File the statutory appeal within thirty days
You file the memorandum of appeal within thirty days with the order, application, scrutiny notes and expert opinion, and ask for a personal hearing. Check the current rules for the exact forum and form.
Watch outThe Act does not provide for extending the thirty days.
Appeal hearing and final decision
You attend the appeal hearing with your architect to explain the drawings and the rules. If no decision comes for months, write formally asking for one.
Watch outThe appeal decision is final as far as civil courts are concerned; only a writ remains.
Serve notice on RAJUK before going to court
Before filing a writ, you serve one month's written notice on RAJUK stating the cause of action, your name and address and the relief sought, and keep proof of delivery. If the matter is urgent, explain the urgency in the petition.
Watch outA missing notice is an easy preliminary objection for RAJUK.
File a writ petition under Article 102
You file a writ petition under Article 102 with an affidavit and the full record, framing the case as an error of law, unfairness or irrationality, and showing that you used the statutory appeal or why it was inadequate.
Watch outThe High Court Division does not redesign buildings, so avoid arguing design merits.
Rule Nisi and interim orders
At the motion hearing your lawyer asks for a Rule Nisi and useful interim relief, such as a direction to decide the application within a fixed time. File a reply to RAJUK's affidavit-in-opposition.
Watch outInterim orders that would effectively grant sanction before final hearing are rare.
Final hearing and judgment
You obtain the certified judgment and serve it on RAJUK promptly, keeping a record of the date. If RAJUK is directed to reconsider, prepare your submissions for the fresh decision.
Watch outCompliance periods run from service, so serve promptly.
Build strictly to the sanction
You build strictly to the approved plan and keep the drawings on site. If you receive a show-cause notice, stop work if it says so and reply within the time given, with your architect's report.
Watch outContinuing work after a stop direction is an offence and undermines any regularisation.
Renew a lapsed sanction
If construction has not reached four feet above plinth within three years, you apply for fresh sanction before continuing. Expect it to be decided under the rules then in force.
Watch outA refusal of fresh sanction carries the same thirty-day appeal.
Occupancy and change of use
On completion you apply for an occupancy certificate and, before any change of use, seek the Authorised Officer's or Committee's prior permission. Appeal any refusal within thirty days.
Watch outWithout an occupancy certificate, a later sale or loan can stall.
RAJUK (respondent)
You want the order upheld as a lawful application of the plan, the rules and the Building Code. You must show that the decision was reasoned, followed a fair process and treated comparable plots consistently. Your biggest risk is an unreasoned order, a missing hearing or unexplained delay, which are the commonest grounds on which writs succeed.
Check the land against the planning rules
RAJUK's planning staff keep the Detailed Area Plan, its amendments and the zoning maps current and accessible, so that applicants and officers apply the same rules. Make sure any circulars on road width or special zones are on record.
Watch outInconsistent application of the plan between neighbouring plots is a common ground of later writ challenges.
Land use clearance where required
RAJUK considers the land use application against the plan and records its decision with reasons in writing. Where other clearances are required, it tells the applicant which ones in good time.
Watch outOral refusals or unexplained delay at this stage invite a writ of mandamus.
Apply for building sanction
The Authorised Officer or Committee receives the application, checks it is complete, and logs the date. Any missing document should be requested promptly and in writing.
Scrutiny and decision by RAJUK
RAJUK's officials scrutinise the drawings against the rules, the plan and the Building Code, and the Authorised Officer or Committee decides, imposing only conditions that have a proper basis. Record the reasons for any refusal or condition.
Watch outUnreasoned conditions or refusals are vulnerable on appeal and in a writ.
Refusal, conditions or cancellation
RAJUK issues a written order with clear reasons, citing the rule or plan provision relied on, and serves it in the prescribed manner. For cancellation, it should show the breach of conditions or the incorrect statement relied on.
Watch outAn order without reasons or proper service weakens RAJUK's position later.
Decide between redesigning and appealing
RAJUK keeps its file in order and checks how comparable neighbouring applications were decided, in case the applicant alleges unequal treatment.
File the statutory appeal within thirty days
RAJUK's planning and engineering staff prepare a response for the appellate authority explaining the basis of the order, with the relevant rules and plan extracts.
Appeal hearing and final decision
The appellate authority hears both sides, decides with reasons and communicates the decision in writing. If the appeal succeeds, RAJUK issues or restores the sanction promptly.
Watch outUnexplained delay in deciding the appeal can support a later writ of mandamus.
Serve notice on RAJUK before going to court
On receiving a notice, RAJUK's legal section reviews the decision and considers whether an obvious error can be corrected without litigation. Keep a record of the notice and any reply.
Watch outIgnoring a notice that points to a clear error can lead to costs and adverse findings later.
File a writ petition under Article 102
As respondent, RAJUK instructs its panel lawyer, collects the full file and checks whether the statutory appeal was used, whether notice was served and whether the petition was filed promptly.
Rule Nisi and interim orders
RAJUK files an affidavit-in-opposition setting out the facts, the rules relied on and any preliminary objections, and complies with any interim direction within the time set.
Watch outFailing to file an affidavit-in-opposition leaves the petitioner's account unanswered.
Final hearing and judgment
RAJUK complies with the judgment within the time set, or decides promptly whether to seek leave to appeal and a stay. Deliberate non-compliance can lead to contempt.
Watch outDelay in complying without seeking a stay risks contempt proceedings.
Build strictly to the sanction
RAJUK officials inspect after reasonable notice, and the Authorised Officer issues a show-cause notice of at least seven days for any deviation, considers the reply and gives a hearing before deciding.
Watch outAn order made without the hearing that section 3B(3) requires is vulnerable to being set aside.
Renew a lapsed sanction
RAJUK decides the fresh application under the current rules and plan, with reasons, and records whether the earlier construction had reached four feet above plinth.
Occupancy and change of use
RAJUK inspects the completed building against the sanction before issuing an occupancy certificate, and decides change-of-use applications with reasons.
What if…? How the building approval appeal in Bangladesh can change course
Choose a scenario. The map animates the route up the hierarchy and, where a case is sent back, down to the lower court and up again.
What if the losing side appeals to the Appellate Division?
- 1Appellate Division of the Supreme Court
Civil petition for leave to appeal
Against the High Court Division's writ judgment, the losing party, often RAJUK, files a civil petition for leave to appeal in the Appellate Division within sixty days, unless the High Court Division has itself certified the case as raising a substantial question of constitutional interpretation. A stay of the judgment can be sought from the Chamber Judge. If leave is granted, the petition becomes a civil appeal heard on the record. The Appellate Division's decision is binding on all courts.
1-3 yearsArticle 103(2)-(3) Constitution of BangladeshOrder XIII rule 1 Supreme Court of Bangladesh (Appellate Division) Rules 1988Article 111 Constitution
Where it ends up: The Appellate Division affirms, varies or sets aside the writ judgment, and its decision is final.
Is there a civil revision?
- 1High Court Division
No civil revision: the writ takes its place
Civil revision under section 115 of the Code of Civil Procedure lies only against decisions of civil courts. The appeal committee is not a civil court, and section 14 of the 1952 Act bars civil courts from questioning orders under the Act. A civil suit for declaration or injunction against a refusal is therefore barred. The High Court Division's writ jurisdiction under Article 102 replaces revision. Revision exists only in a prosecution, where a magistrate's order can be revised by the Sessions Judge or the High Court Division under the Code of Criminal Procedure.
Not applicables.14 Building Construction Act 1952s.115 Code of Civil Procedure 1908Article 102 Constitution of Bangladesh
Where it ends up: The legality of the appeal decision is tested only by writ in the High Court Division.
Can the Appellate Division reconsider its decision?
- 1Appellate Division of the Supreme Court
Review under Article 105
The Appellate Division may review its own judgment or order, subject to its rules, on narrow grounds similar to those in Order XLVII of the Code: an error apparent on the face of the record or new and important material that could not be produced earlier. The review petition must be filed within thirty days of the judgment. A review is not a rehearing of the appeal, and few succeed.
3-12 monthsArticle 105 Constitution of BangladeshOrder XXVI Supreme Court of Bangladesh (Appellate Division) Rules 1988
Where it ends up: The review is dismissed, or the judgment is corrected on the narrow point.
What if the two High Court judges disagree?
- 1High Court Division
Reference to a third judge
Writ petitions are heard by a Division Bench of two judges. If they deliver split opinions, the Chief Justice refers the matter to a third judge, whose opinion decides the outcome. The case then follows the majority view, and the losing side can still seek leave from the Appellate Division. There is no reference from RAJUK or the appeal committee to a court; they decide the matter themselves.
6-18 monthsArticle 107(3) Constitution of Bangladesh (Chief Justice constitutes benches)Article 102 Constitution of Bangladesh
Where it ends up: The third judge's opinion settles the High Court Division's decision, subject to leave to the Appellate Division.
What if the court sends the application back to RAJUK?
- 1High Court Division
High Court Division directs fresh consideration
The commonest successful outcome is not an order granting sanction but a direction that RAJUK or the appeal committee decide the application or appeal again according to law, often within a fixed period and after giving the applicant a hearing. The court identifies the legal error, such as applying the wrong rules or ignoring a relevant document, and leaves the planning judgment to the authority.
Order on the date of judgmentArticle 102(2)(a)(ii) Constitution of Bangladesh - 2Statutory appellate authority under s.15 (appeal committee)
Fresh decision and possible return to court
The authority rehears the matter and makes a fresh decision with reasons. If it grants sanction, the case ends. If it refuses again on a lawful basis, that new order can be appealed within thirty days and then challenged by a fresh writ. A refusal that ignores the judgment can be brought back by contempt petition.
1-6 monthss.15 Building Construction Act 1952Article 108 Constitution of Bangladesh (contempt)
Where it ends up: The authority decides afresh; a lawful refusal starts a new appeal and writ cycle, while defiance leads to contempt.
What if the owner is prosecuted for building without approval?
- 1Metropolitan or Judicial Magistrate / mobile court
Prosecution before a magistrate
Building without sanction, ignoring a section 3B direction, or breaching the Building Code is punishable under the 1952 Act with up to seven years' imprisonment, a fine of at least Tk 50,000, or both, but only on complaint by the Authorised Officer, the Committee or a person they authorise. The 2026 RAJUK Act separately punishes building outside the approved plan with up to two years or a fine of up to Tk 50 lakh, tried by a Metropolitan or first-class Judicial Magistrate or in a mobile court.
6-24 monthsss.12(1) and 13(2) Building Construction Act 1952ss.54, 59, 60 and 61 Rajdhani Unnayan Kartripakkha Act 2026 - 2Metropolitan Sessions Judge (criminal revision and appeal)
Criminal appeal or revision
A conviction can be appealed to the Sessions Judge, and orders of the magistrate can be challenged in criminal revision before the Sessions Judge or the High Court Division under the Code of Criminal Procedure. The court convicting under the 1952 Act can also fix a date for removal of the unauthorised work on the prosecution's application.
6-18 monthsss.408, 435 and 439 Code of Criminal Procedure 1898s.12(1)-(2) Building Construction Act 1952
Where it ends up: The conviction is upheld, modified or set aside; any removal order made on conviction is enforced at the owner's cost.
How the building approval appeal in Bangladesh moves up the court hierarchy
A building approval appeal in Bangladesh has a deliberately short ladder. At the bottom, RAJUK's Authorised Officer or Building Construction Committee grants, conditions, refuses or cancels sanction under the Building Construction Act 1952; since 2026 the RAJUK Act confirms that no other authority can approve building work in RAJUK's area. One appeal lies, within thirty days, to the officer or authority prescribed by the building rules, which in RAJUK's area is an appeal committee; it can reconsider the merits, and its decision is final.
Section 14 bars the civil courts entirely, so there is no suit, civil appeal or civil revision. The next forum is the High Court Division under Article 102, which reviews legality, fairness and rationality rather than design, and usually sends the matter back for a fresh decision rather than granting sanction itself. From there, the Appellate Division hears the case only by leave, on a substantial question of law. Prosecutions for unauthorised building run separately through magistrates and the Sessions Judge.
- Appellate DivisionAppellate Division of the Supreme Court
- High Court DivisionHigh Court Division
- Appellate levelMetropolitan Sessions Judge (criminal revision and appeal)
- First instanceMetropolitan or Judicial Magistrate / mobile court
- Start · outside courtLawyer's chamber · RAJUK: Authorised Officer / Building Construction Committee · Statutory appellate authority under s.15 (appeal committee)
Where your case is heard
Addresses are for Dhaka. Every district has equivalent courts at its own district judgeship.
Supreme Court of Bangladesh (Appellate Division and High Court Division)
Supreme Court of Bangladesh, Shahbag, Ramna, Dhaka-1000Hears appeals, revisions, references, writ petitions under Article 102, company matters and death references (High Court Division), and appeals by leave from the High Court Division (Appellate Division).
Both Divisions sit in the Supreme Court complex; many High Court Division benches sit in the Annex Building. Check the daily cause list for the bench and court room. Postal contact is the Registrar General, Supreme Court of Bangladesh, Ramna, Dhaka-1000.
Court of the Metropolitan Sessions Judge, Dhaka
40-45 Johnson Road, Dhaka-1100Tries sessions-triable offences from Dhaka metropolitan police stations and hears criminal appeals and revisions from Metropolitan Magistrates; Additional and Joint Metropolitan Sessions Judges also sit as Metropolitan Special Tribunals.
The Metropolitan Sessions Judge sits on the 2nd floor of the main building; Additional and Joint Metropolitan Sessions Judge courts are in the main building and the tin-shed building in the same compound. The Metropolitan Sessions Judge, Dhaka also holds the post of Senior Special Judge, Dhaka. Help line published by the court: 01335-145002.
Chief Metropolitan Magistrate Court, Dhaka
19 Johnson Road, Dhaka-1100Takes cognisance of and tries criminal cases arising in Dhaka Metropolitan Police areas (Metropolitan Magistrate courts), hears bail, remand and FIR/complaint matters, and sends sessions-triable cases to the Metropolitan Sessions Judge.
Metropolitan Magistrate courts are spread over the CMM court main building (floors 2-9) and the CJM court building (courts 29-37 on the 8th and 9th floors). Check the court number on the cause list. Each metropolitan city (Chattogram, Khulna, Rajshahi, Sylhet, Barishal, Rangpur, Gazipur) has its own CMM court.
Lawyer's chamber
Where this happens depends on your district or the office concerned. Ask us for the exact courtroom and address.
Rajdhani Unnayan Kartripakkha (RAJUK), Head Office
RAJUK Bhaban, Motijheel, DhakaApproves building plans and land use in the Dhaka area under the Town Improvement Act 1953 and building rules, and issues notices and carries out demolition of unauthorised construction.
The official website could not be reached when checked, so the street address was not verified. Many plan-approval and enforcement matters are handled by RAJUK's zonal offices. Check the current address before visiting.
How long each stage takes
These are indicative ranges based on typical Dhaka practice. Adjournments, case backlogs and appeals can stretch them.
Documents checklist and key terms
Tick off what you have. Your ticks stay saved in this browser. Bring the list to your first meeting with your lawyer.
- RAJUK
- Rajdhani Unnayan Kartripakkha, the capital development authority that approves building plans in its area of Dhaka.
- Authorised Officer
- The officer appointed under the 1952 Act to grant or refuse building sanction and to act against unauthorised construction.
- Building Construction Committee
- A committee to which the Government can transfer the Authorised Officer's power to grant sanction in a notified area.
- Sanction
- Formal approval to construct, reconstruct, add to or alter a building; valid for three years.
- Detailed Area Plan (DAP)
- RAJUK's plan for 2022-2035 that sets land use zones, density and building limits across its area.
- Appeal committee
- The authority prescribed by the building rules to hear appeals under section 15 of the 1952 Act in RAJUK's area.
- Rule Nisi
- The High Court Division's order calling on the authority to show cause why the challenged decision should not be declared unlawful.
- Occupancy certificate
- A certificate confirming that a completed building matches its sanction and can be occupied.
Building approval appeal in Bangladesh: common questions
How long do I have to file a building approval appeal in Bangladesh?
Can I go to the civil court if RAJUK refuses my plan?
What orders can be appealed?
Will the High Court Division approve my building?
Do I need to give RAJUK notice before filing a writ?
How long does a building approval appeal in Bangladesh take?
My sanction expired before I built. What now?
What if I built beyond my approved plan?
Law and sources
- Building Construction Act 1952 (E.B. Act II of 1953), consolidated — Laws of Bangladesh
- Bangladesh Gazette, 10 April 2026 — Rajdhani Unnayan Kartripakkha Act 2026 (Act No. 67 of 2026) (Bangla)
- Constitution of Bangladesh, Article 102 — Laws of Bangladesh
- Constitution of Bangladesh, Article 103 — Laws of Bangladesh
- Supreme Court of Bangladesh (Appellate Division) Rules 1988
- High Court Division, Writ Petition No. 9743 of 2013 and 2340 of 2017 (Building Construction Rules 1996 and 2008)
- bdnews24, 12 July 2026 — DAP 2022-2035 gazette and 2023 amendment (Bangla)
- The Business Standard, 19 October 2025 — DAP amendment approved, building height limits raised
This Case Journey is a general guide to procedure in Bangladesh as of October 2026. It is not legal advice. Procedure, fees and time limits change, and every case turns on its own facts. Timelines are indicative. Speak to a lawyer about your own matter.
Run this case from outside Bangladesh
You can usually start and run this case without travelling. You sign a power of attorney abroad, the Bangladesh High Commission or Embassy attests it, and your attorney and lawyer act for you in Dhaka. Some steps, such as giving evidence in person, may still need you or a commission. See how a case runs through a power of attorney →
Want to know where your case stands?
Book a consultation. A TRW lawyer will place your matter on this map, explain the next step and the realistic timeline, and tell you what to prepare.