Electricity theft case in Bangladesh: the full journey, step by step

by Barrister Tahmidur Rahman | Nov 15, 2026

Case Journeys/Criminal

Electricity theft case in Bangladesh: the full journey, step by step

An electricity theft case in Bangladesh starts when a distribution company's engineers find an illegal connection, a bypass device or a tampered meter, disconnect the supply and, within seven working days, file a written complaint in the Magistrate's court under the Electricity Act 2018. A first-time offender can avoid prosecution by paying three times the value of the electricity taken plus fees, if the company agrees.

Contested cases are tried by a first class Judicial or Metropolitan Magistrate, with appeal to the Sessions Judge, while billing disputes go to the energy regulator, BERC.

Step through it on the page
Inspection or raid by the licensee
▶Play full screen15 steps · 7 what-ifs · 7 courts & offices
Where it starts
Inspection at the consumer's premises by the distribution licensee (DPDC, DESCO, BREB, BPDB, WZPDCL or NESCO), followed…
Main law
Electricity Act 2018 (Act 7 of 2018), ss.2(12), 17-20, 32-54; Code of Criminal Procedure 1898; Mobile Court Act 2009
Typical duration
Settlement and reconnection: days to weeks. Contested prosecution before a Magistrate: roughly 1-3 years in Dhaka.…
Who can file
Only an Assistant Engineer, Assistant General Manager or officer of equal rank authorised by the licensee can file the…
Interactive journey · 15 steps

Electricity theft case in Bangladesh: walk through every stage

Press next, use your arrow keys or tap a court on the map. The gold marker shows where your case is, and the green trail shows the route it has taken. For the immersive version, play it full screen.

Walk through as
Where your case is
UpBack down
Read every step as text
  1. Electricity theft case in Bangladesh: step 1, Inspection or raid by the licensee
    Step 1 · Inspection and disconnection

    Inspection or raid by the licensee

    Distribution companies run routine meter checks and targeted drives against illegal connections. A licensee or its authorised person may enter connected premises at a reasonable time, after informing the owner or occupier, to test lines, fittings and the meter. Where there is reason to believe unauthorised use is taking place, an Assistant Engineer, Assistant General Manager or equivalent officer authorised by the licensee may enter, break open doors and search. Obstructing a lawful inspection is itself a ground for disconnection. Electricity theft is defined as taking and using an illegal connection.

    Where: Consumer's premises (inspection and mobile court) · Time: Hours · Law: s.2(12) Electricity Act 2018; s.19(1) and (3) Electricity Act 2018; s.46(1) Electricity Act 2018 · Documents: Authorisation of the inspecting officer, Customer account details, Meter reading history

    Tip: Ask to see the officer's written authorisation and stay present throughout; the law requires the search to be done in the presence of the owner or a representative.

  2. Electricity theft case in Bangladesh: step 2, Search record and seizure list
    Step 2 · Inspection and disconnection

    Search record and seizure list

    The officer may seize equipment, cables or devices used for unauthorised supply and examine or seize account books and documents. The search must take place in the presence of the owner or a representative. A list of everything seized must be prepared and signed by that person and by at least two neutral witnesses, and the Code of Criminal Procedure applies to the search as far as possible. Anything used to commit an offence under the Act is liable to confiscation to the Government.

    Photographs and a meter test record are usually prepared on the spot.

    Where: Consumer's premises (inspection and mobile court) · Time: During the inspection · Law: s.46(1)(b), (2) and (3) Electricity Act 2018; s.42 Electricity Act 2018; s.103 CrPC · Documents: Seizure list, Inspection report, Photographs of the connection or meter

    Tip: Read the seizure list before signing. If it is wrong, write your objection on it or note that you sign only as present.

  3. Electricity theft case in Bangladesh: step 3, Immediate disconnection
    Step 3 · Inspection and disconnection

    Immediate disconnection

    Once a licensee learns of theft by a person or consumer, it must disconnect the supply at once. A licensee may also disconnect for unpaid bills, illegal use or failure to look after the meter, following the prescribed procedure. Section 18(2) of the Electricity Act 2018 says no court may order a licensee to reconnect a consumer disconnected under that power. Reconnection follows only when the prescribed conditions are met. That bar makes the settlement and regulatory routes more important than they first appear.

    Where: Consumer's premises (inspection and mobile court) · Time: Same day · Law: s.48(1) Electricity Act 2018; s.18(1)-(2) Electricity Act 2018; s.17(4) Electricity Act 2018; s.20 Electricity Act 2018 · Documents: Disconnection notice or report, Customer account number

    Tip: Ask in writing for the disconnection report and the inspection findings. You will need them for any settlement, BERC complaint or defence.

  4. Electricity theft case in Bangladesh: step 4, Assessment of the electricity taken
    Step 4 · Inspection and disconnection

    Assessment of the electricity taken

    The licensee calculates the value of the electricity it says was stolen, usually from the connected load, the period of use and the tariff. That figure drives both the settlement amount and the court's fine, since theft is punishable with a fine of twice the value. For ordinary billing the meter record is presumed correct unless the contrary is proved, so a consumer who says the meter was faulty must produce evidence. The licensee's internal procedure and tariff orders govern the method, and the consumer should ask for the working in writing.

    Where: Distribution licensee office (DPDC, DESCO, BREB, BPDB) · Time: 1-2 weeks · Law: s.32 Electricity Act 2018; s.17(5) Electricity Act 2018 (meter presumption) · Documents: Assessment sheet or supplementary bill, Connected load survey, Tariff applied

    Tip: Check the period and load used in the assessment. Over-long back-dating and inflated load figures are the commonest errors.

  5. Step 5: First-offence settlement at three times the value
    Step 5 · Settlement or mobile court

    First-offence settlement at three times the value

    For a first offence only, the licensee may decide not to file a case if the consumer or accused pays three times the value of the electricity stolen, the cost of any meter supplied, disconnection and reconnection fees and other applicable charges. The licensee may then refrain from filing a case and may restore the connection within forty-eight hours of payment. The decision is the licensee's: it is not obliged to accept, and the concession applies only once.

    This is the most common way an electricity theft case in Bangladesh ends for households and small shops.

    Where: Distribution licensee office (DPDC, DESCO, BREB, BPDB) · Time: Days to weeks · Law: s.48(1) first and second provisos Electricity Act 2018 · Documents: Settlement application, Payment receipts, Undertaking, if required

    Tip: Pay only against an official receipt that records the settlement under s.48 and the account number. Informal payments give no protection from prosecution.

  6. Step 6: Mobile court on the spot
    Step 6 · Settlement or mobile court

    Mobile court on the spot

    Drives against illegal connections are often accompanied by an Executive Magistrate running a mobile court. The 2018 Act lets a mobile court punish its offences so far as they are listed in the Schedule to the Mobile Court Act 2009. The magistrate can act only on an offence committed or revealed in their presence, must frame a short written charge, and can convict only on a recorded confession signed by the accused and two witnesses. The mobile court cannot impose more than two years' imprisonment.

    Where: Consumer's premises (inspection and mobile court) · Time: Same day · Law: s.51 Electricity Act 2018; ss.6-9 Mobile Court Act 2009 · Documents: Written charge, Recorded confession, Mobile court order and fine receipt

    Tip: Do not sign a confession you dispute just to end the drive. Without a confession, the magistrate must send the matter to the regular court.

  7. Step 7: Written complaint within seven working days
    Step 7 · Complaint and appearance

    Written complaint within seven working days

    If there is no settlement, the licensee must file a written complaint in the court with jurisdiction within seven working days of disconnection. No court may take cognizance of an offence under the Act except on a complaint by an Assistant Engineer, Assistant General Manager or officer of equal rank authorised by the licensee. Although the offences are cognizable, so the police can arrest without a warrant, no court can proceed on a police FIR or a private complaint in an electricity theft case in Bangladesh.

    In Dhaka the complaint is filed in the Chief Metropolitan Magistrate's court and sent to a Metropolitan Magistrate. A complaint by an unauthorised officer is a strong ground for challenge.

    Where: Chief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate) · Time: Within 7 working days of disconnection · Law: s.47 Electricity Act 2018; s.48(1) Electricity Act 2018; s.50 Electricity Act 2018; s.200 CrPC · Documents: Petition of complaint, Authorisation letter, Seizure list and inspection report, Assessment sheet

    Tip: Ask for the date of the complaint and the date of disconnection. A complaint filed late, or by an officer below the required rank, should be raised at once.

  8. Step 8: Summons, appearance and bail
    Step 8 · Complaint and appearance

    Summons, appearance and bail

    The Magistrate issues summons or a warrant. Whether bail is a right depends on the section. Theft of electricity under s.32, wasteful diversion under s.34, and offences under ss.36, 37 and 40 are bailable and compoundable. Installing a bypass device under s.33, stealing equipment under s.35, meter interference under s.38 and sabotage under s.39 are non-bailable and non-compoundable, so bail is discretionary. Most offences under the Act carry up to three years. The accused appears with a lawyer and applies for bail.

    Where: Chief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate) · Time: 1-3 months after the complaint · Law: s.50 Electricity Act 2018; ss.496-497 CrPC · Documents: Bail petition, Copy of complaint, Proof of identity and address

    Tip: Check which section is charged. A s.33 or s.38 allegation changes the bail position and the possibility of compromise.

  9. Step 9: Compounding a compoundable offence
    Step 9 · Complaint and appearance

    Compounding a compoundable offence

    For offences the Act makes compoundable, the licensee and the accused can settle the case in court, usually after the dues are paid, and the Magistrate records the compromise and acquits. This remains possible after the seven-day complaint has been filed, and for repeat consumers who cannot use the first-offence route. Compounding is not available for the non-compoundable offences in ss.33, 35, 38 and 39, which must go to trial unless the complaint is withdrawn under the Code with the court's consent.

    Where: Chief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate) · Time: 1-3 months · Law: s.50 Electricity Act 2018; s.345 CrPC; s.248 CrPC · Documents: Joint compromise petition, Payment receipts, Licensee's no-objection

    Tip: Make sure the compromise petition records that all dues are cleared, so that recovery is not pursued separately later.

  10. Step 10: Charge and the start of the trial
    Step 10 · Trial before the Magistrate

    Charge and the start of the trial

    Offences under the Electricity Act 2018 are tried by a first class Judicial Magistrate or, in metropolitan areas, a Metropolitan Magistrate, following the Code of Criminal Procedure. The Magistrate hears both sides on whether the complaint discloses an offence. The accused can be discharged if the charge is groundless. If not, a charge is framed and read out, and the accused pleads guilty or claims trial. The Act lets the Magistrate impose any fine it prescribes, even above the Magistrate's usual fine limit.

    Where: Chief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate) · Time: 1-3 months · Law: s.49(1)-(2) Electricity Act 2018; ss.241A-242 CrPC · Documents: Charge, Copies of documents relied on, Discharge application, if any

    Tip: A discharge application is worth filing where the complaint was late, unauthorised or rests only on an assessment sheet with no seizure evidence.

  11. Step 11: Prosecution evidence
    Step 11 · Trial before the Magistrate

    Prosecution evidence

    The complainant engineer, the inspection team and the seizure witnesses give evidence, and the seized cables, devices or meter are produced. Under s.33(2), if a bypass device or artificial means is proved to have been used in a dwelling, the occupier is presumed to have committed the offence unless the contrary is proved. The defence tests whether the inspection and search followed s.46, whether the neutral witnesses were genuine, and whether the meter test report is reliable. A tenant or occupier who had no control over the wiring should say so with evidence.

    Where: Chief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate) · Time: 6-18 months in practice · Law: s.33(2) Electricity Act 2018; s.46(2) Electricity Act 2018; s.244 CrPC · Documents: Seized items, Meter test report, Photographs and inspection report

    Tip: If the premises were let, produce the tenancy agreement and rent receipts. They are central to rebutting the occupier presumption.

  12. Step 12: Examination, defence and judgment
    Step 12 · Trial before the Magistrate

    Examination, defence and judgment

    The Magistrate questions the accused on the evidence under s.342, hears any defence witnesses and then gives judgment. On conviction for theft, the court can impose up to three years, a fine of twice the value of the electricity or Tk 50,000 for domestic use (Tk 5 lakh for industrial or commercial use), or both. A repeat conviction doubles the punishment. A fine does not replace the consumer's liability to pay compensation and dues. For a company, directly involved owners, directors and managers are deemed guilty unless they prove lack of knowledge and due diligence.

    Where: Chief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate) · Time: 1-3 months after evidence closes · Law: s.32(1)-(2) Electricity Act 2018; ss.44, 45 and 52 Electricity Act 2018; s.342 CrPC · Documents: Judgment, Order on seized items, Fine receipt

    Tip: Apply for the certified copy at once if you intend to appeal, because the appeal period is short.

  13. Step 13: Recovery of dues as a public demand
    Step 13 · Dues, reconnection and disputes

    Recovery of dues as a public demand

    Separately from any fine, money owed to a licensee for electricity supplied can be recovered as a public demand under the Public Demands Recovery Act 1913. The licensee files a requisition with the Certificate Officer, who issues a certificate and can attach property if it is not paid. A consumer who disputes the amount can object before the Certificate Officer under that Act. In practice, an electricity theft case in Bangladesh is often resolved commercially at this stage, with instalment arrangements for the assessed bill.

    Where: Distribution licensee office (DPDC, DESCO, BREB, BPDB) · Time: 1-12 months · Law: s.54 Electricity Act 2018; Public Demands Recovery Act 1913 · Documents: Certificate of demand, Objection or instalment application, Payment receipts

    Tip: Respond to a certificate notice within the time stated. Ignoring it can lead to attachment of bank accounts or property.

  14. Step 14: Reconnection
    Step 14 · Dues, reconnection and disputes

    Reconnection

    After disconnection, the licensee must reconnect once the prescribed conditions are fulfilled, typically payment of dues or the settlement amount, fees and, where needed, a new or tested meter. Under the first-offence route, the Act allows the licensee to reconnect within forty-eight hours of payment. Because no court can order reconnection of a supply cut under s.18, the practical lever is to meet the conditions and press the licensee in writing, or to complain to BERC if it refuses without reason.

    Where: Distribution licensee office (DPDC, DESCO, BREB, BPDB) · Time: 2 days to 2 weeks · Law: s.20 Electricity Act 2018; s.48(1) proviso Electricity Act 2018; s.18(2) Electricity Act 2018 · Documents: Reconnection application, Payment receipts, Meter installation report

    Tip: Keep a dated copy of the reconnection application and receipts; delay after full payment is a strong point before BERC.

  15. Step 15: Billing and supply disputes before BERC
    Step 15 · Dues, reconnection and disputes

    Billing and supply disputes before BERC

    Disputes about supply or use of electricity are governed by the Bangladesh Energy Regulatory Commission Act 2003. A consumer first complains to the licensee, which must resolve the complaint within seven days, and then to BERC, which must make an order within seven days. BERC can also decide disputes between licensees and consumers and make interim orders. It cannot try the criminal offence, but it is the proper forum for an inflated assessment, refusal to reconnect or a wrong tariff.

    Where: Bangladesh Energy Regulatory Commission · Time: 2-6 weeks if the timelines are kept · Law: s.53 Electricity Act 2018; s.40 and s.54 Bangladesh Energy Regulatory Commission Act 2003 · Documents: Complaint to the licensee, Application to BERC, Bills, assessment and payment records

    Tip: Raise billing disputes with BERC in parallel with the criminal defence; the regulator's finding on the bill can help in court.

Both sides of the case

Walk through it from your side

Pick your side. The step-by-step journey above and the full-screen player will then show what you do at every stage.

Walk through as
You are the distribution company and its authorised Assistant Engineer, AGM or equivalent officer who inspects, disconnects and files the complaint

Licensee (complainant)

You want unauthorised use stopped, the value of the electricity recovered and, where settlement fails, a conviction under the Electricity Act 2018. You must show a lawful inspection and search, a signed seizure list with two neutral witnesses, a credible assessment and a complaint filed by an authorised officer within seven working days of disconnection. Your biggest risk is a procedural slip, such as a late complaint or one signed by an officer below the required rank.

  1. Inspection or raid by the licensee

    Your authorised officer carries written authorisation, informs the owner or occupier before routine entry and, where theft is suspected, enters and searches under s.46 with a team that includes neutral witnesses. Bring the meter test kit and a camera.

    Watch outOnly an Assistant Engineer, AGM or officer of equal rank authorised by the licensee may search and break open premises under s.46.

  2. Search record and seizure list

    You prepare a list of everything seized and have it signed by the owner or representative and at least two neutral witnesses. Photograph the connection, the device and the meter, and record the meter reading and test result.

    Watch outA list without two neutral witnesses' signatures is a strong defence point at trial.

  3. Immediate disconnection

    You disconnect the supply at once on learning of theft, prepare a disconnection report and record the reason and the provision relied on.

    Watch outThe seven-working-day complaint clock starts from disconnection, so date the report accurately.

  4. Assessment of the electricity taken

    Your accounts team calculates the value of the electricity taken from the connected load, period of use and tariff, and records the working so it can be shown to the consumer, the court or BERC.

    Watch outBack-dating the period or inflating the load without basis invites a BERC challenge and weakens the prosecution.

  5. First-offence settlement at three times the value

    You decide whether a first-time offender may settle by paying three times the value plus the meter cost and fees. If you accept, issue an official receipt referring to s.48 and you may reconnect within 48 hours of payment.

    Watch outCheck the consumer's history first, because the concession applies only to a first offence.

  6. Mobile court on the spot

    Where a mobile court accompanies the drive, your officers present the facts to the Executive Magistrate and produce the seized items and meter record.

    Watch outA mobile court can convict only on a recorded confession; without one the matter must go to the regular court.

  7. Written complaint within seven working days

    If there is no settlement, your authorised Assistant Engineer, AGM or equivalent files a written complaint in the Magistrate's court within seven working days of disconnection, attaching the inspection report, seizure list, assessment and authorisation.

    Watch outA late complaint, or one by an officer below the required rank, is the commonest ground for discharge.

  8. Summons, appearance and bail

    The complainant engineer attends court on the summons date with the original documents, and the licensee's lawyer addresses bail on the section charged.

    Watch outFor the non-bailable sections, prepare to explain why custody or conditions are needed, since bail is discretionary.

  9. Compounding a compoundable offence

    For compoundable offences, you can agree a compromise once the dues are paid and file it in court, and the Magistrate records it and acquits.

    Watch outMake sure the compromise petition records full payment so that no dues are left outstanding.

  10. Charge and the start of the trial

    Your lawyer opposes discharge by pointing to the seizure evidence, the neutral witnesses and the authorised complaint, and asks the Magistrate to frame a charge under the correct section.

    Watch outA complaint that rests only on an assessment sheet, with no seizure evidence, is vulnerable to discharge.

  11. Prosecution evidence

    You call the complainant engineer, the inspection team and the neutral seizure witnesses, and produce the seized cables, devices or meter and the test report.

    Watch outSeizure witnesses who turn out not to be neutral, or who do not support the search, can sink the case.

  12. Examination, defence and judgment

    Your lawyer argues on the evidence and, on conviction, asks for a fine reflecting the value of the electricity, and reminds the court that the fine is in addition to compensation and dues.

    Watch outA repeat conviction doubles the punishment, so prove any earlier conviction properly.

  13. Recovery of dues as a public demand

    You file a requisition with the Certificate Officer to recover unpaid dues as a public demand, separately from any fine.

    Watch outKeep the dues calculation consistent with what was put in the criminal case, or it will be challenged.

  14. Reconnection

    You reconnect once the prescribed conditions are met, such as payment of dues or the settlement amount, fees and any new or tested meter, and record the date of reconnection.

    Watch outUnreasonable delay after full payment can be taken to BERC.

  15. Billing and supply disputes before BERC

    Your complaint centre resolves consumer complaints within seven days and answers any BERC application with the assessment working and inspection records.

    Watch outBERC must make an order within seven days of an application, so respond promptly.

You are the consumer, occupier or owner accused of theft, bypass or meter tampering, and you are presumed innocent

Consumer / accused

You want the supply restored, the assessed bill reduced to what is fair and the prosecution avoided, compounded or ended in acquittal. You can use the first-offence settlement, raise billing disputes with BERC and, at trial, test whether the inspection, seizure and complaint followed the Act. Your biggest risk is ignoring the early stages, signing papers you dispute or letting the settlement window and the public demand notice pass.

  1. Inspection or raid by the licensee

    Ask to see the officer's written authorisation, stay present throughout or send a representative, and allow the inspection to proceed. Note the names of the team and the time they arrived.

    Watch outObstructing a lawful inspection is itself a ground for disconnection, so object in words and in writing, not physically.

  2. Search record and seizure list

    Read the seizure list before signing. If it is wrong, write your objection on it or note that you sign only as having been present, and photograph the scene yourself.

    Watch outDo not sign anything that admits theft or describes the wiring wrongly just to end the visit.

  3. Immediate disconnection

    Ask in writing for the disconnection report and inspection findings, and keep copies. Make safe arrangements for essential power use without reconnecting yourself.

    Watch outReconnecting the supply yourself is a further offence and destroys any chance of a settlement.

  4. Assessment of the electricity taken

    Ask for the assessment and its working in writing, check the period and the load used, and gather your old bills and meter readings to compare.

    Watch outIf you say the meter was faulty, you must produce evidence, because the meter record is presumed correct.

  5. First-offence settlement at three times the value

    If this is your first offence and you accept the assessment, ask the licensee in writing to settle under s.48, and pay only against an official receipt that names the provision and your account number.

    Watch outThe licensee is not obliged to accept, and informal payments give no protection from prosecution.

  6. Mobile court on the spot

    If an Executive Magistrate frames a charge on the spot, you may admit it or explain why you deny it. If your explanation is not accepted, the case is sent to the regular court.

    Watch outDo not sign a confession you dispute just to end the drive; a mobile court sentence on appeal is limited to its extent or legality.

  7. Written complaint within seven working days

    Your lawyer obtains the complaint and checks its date against the disconnection date and the complainant's rank and authorisation.

    Watch outRaise any lateness or lack of authority at the first opportunity, ideally in a discharge application.

  8. Summons, appearance and bail

    You appear with a lawyer on the date in the summons and apply for bail. Check which section is charged, because theft under s.32 is bailable while bypass or meter tampering under s.33 or s.38 is not.

    Watch outMissing a summons date can lead to a warrant.

  9. Compounding a compoundable offence

    If the offence is compoundable, you negotiate the dues with the licensee, pay against receipts and file a joint compromise petition with your lawyer.

    Watch outCompounding is not available for ss.33, 35, 38 and 39, which go to trial unless the complaint is withdrawn with the court's consent.

  10. Charge and the start of the trial

    Your lawyer files a discharge application where the complaint was late, unauthorised or unsupported by seizure evidence. If a charge is framed, you plead and claim trial if you contest it.

    Watch outCheck the charge is under the right section; the section decides bail, compounding and sentence.

  11. Prosecution evidence

    Your lawyer cross-examines on whether the search followed s.46, whether the witnesses were genuinely neutral and whether the meter test was reliable. If you are a tenant, produce the tenancy agreement and rent receipts.

    Watch outIn a bypass case in a dwelling the occupier is presumed responsible unless the contrary is shown, so bring evidence early.

  12. Examination, defence and judgment

    You answer the s.342 questions, may call defence witnesses such as a landlord or electrician, and your lawyer argues the case. If convicted, apply for the certified copy at once.

    Watch outThe appeal period to the Sessions Judge is short, so start the appeal immediately.

  13. Recovery of dues as a public demand

    If you receive a certificate notice, respond within the time stated and file an objection if you dispute the amount, or propose instalments.

    Watch outIgnoring a certificate notice can lead to attachment of bank accounts or property.

  14. Reconnection

    You apply in writing for reconnection with receipts for all payments and keep a dated copy. If the licensee refuses without reason, complain to BERC.

    Watch outNo ordinary court can order reconnection of a supply cut under s.18, so meet the conditions and use the regulatory route.

  15. Billing and supply disputes before BERC

    You complain first to the licensee's complaint centre and, if it is not resolved in seven days, apply in writing to BERC about an inflated assessment, wrong tariff or refusal to reconnect.

    Watch outBERC cannot try the criminal offence; run the billing dispute alongside your defence, not instead of it.

Branches · appeal, revision, review, reference, remand

What if…? How the electricity theft case in Bangladesh can change course

Choose a scenario. The map animates the route up the hierarchy and, where a case is sent back, down to the lower court and up again.

Route of this scenario
UpRemand
Appeal · Magistrate → Sessions Judge

What if the accused is convicted and wants to appeal?

  1. 1
    Metropolitan Sessions Judge's Court, Dhaka

    Criminal appeal to the Sessions Judge

    A person convicted by a Metropolitan or first class Judicial Magistrate appeals to the Sessions Judge, in Dhaka the Metropolitan Sessions Judge, who may hear it or send it to an Additional Sessions Judge. The appeal must be filed within thirty days of the sentence, excluding the time taken to obtain the certified copy. It is a rehearing of facts and law on the record, and the court can suspend the sentence and grant bail pending appeal.

    6-18 monthss.408 CrPCs.426 CrPCArticle 154 Limitation Act 1908
  2. 2
    Metropolitan Sessions Judge's Court, Dhaka

    Appeal against a mobile court sentence

    A mobile court sentence is appealed first to the District Magistrate, who may hear it or send it to an Additional District Magistrate, and then to the Sessions Judge. Because the conviction rests on a confession, the appeal is limited to the extent or legality of the sentence.

    3-12 monthss.13(1)-(5) Mobile Court Act 2009s.412 CrPC

Where it ends up: The Sessions Judge affirms, reduces or sets aside the conviction, or orders a retrial.

Revision · Magistrate → Sessions Judge → High Court Division

What if a party challenges an interim order or the appeal decision?

  1. 1
    High Court Division

    Criminal revision

    Orders of the Magistrate, such as framing a charge or refusing discharge, can be challenged by revision before the Sessions Judge or the High Court Division. A party who chooses the Sessions Judge cannot then bring a second revision to the High Court Division. After an appeal, the Sessions Judge's appellate judgment can be revised by the High Court Division, which looks at errors of law and serious procedural defects, not a fresh view of the evidence. Proceedings that are an abuse of process can also be quashed.

    6 months to 2 yearss.435 and s.439A CrPCs.439 CrPCs.561A CrPC

Where it ends up: The order or conviction is set aside or corrected, or the revision is dismissed and the case continues.

Review · Magistrate → Appellate Division

Can the Magistrate review the judgment?

  1. 1
    Chief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate)

    No review by the trial court

    Once a criminal court has signed its judgment, it cannot alter or review it, except to correct a clerical error. The remedy against a wrong conviction is appeal or revision, and a review petition does not stop the appeal period from running.

    Not applicables.369 CrPC
  2. 2
    Appellate Division of the Supreme Court

    Review in the Appellate Division

    Only the Appellate Division can review its own judgment, and in criminal matters only for an error apparent on the face of the record, within thirty days.

    3-12 monthsArticle 105 ConstitutionOrder XXVI Supreme Court (Appellate Division) Rules 1988

Where it ends up: The trial judgment stands unless changed on appeal or revision.

Alternative route · Magistrate → Sessions Judge → High Court Division

Is there any reference to the High Court Division?

  1. 1
    High Court Division

    No reference stage in theft cases

    No offence under the Electricity Act 2018 carries death, so the death reference procedure never applies, and the Act creates no reference to the High Court Division on questions of law. A legal question, such as whether a complaint by an unauthorised officer is valid, reaches the High Court Division through revision against the Sessions Judge's decision.

    Through revision: 6 months to 2 yearss.374 CrPC (death sentences only)s.439 CrPC

Where it ends up: Points of law are decided by the High Court Division in revision, not on reference.

Remand · Sessions Judge → Magistrate → Sessions Judge

What if the appeal court sends the case back?

  1. 1
    Metropolitan Sessions Judge's Court, Dhaka

    Retrial ordered on appeal

    If the Sessions Judge finds a serious defect, for example the seizure witnesses were never examined or the accused was not questioned under s.342, it can set aside the conviction and send the case back to the Magistrate for retrial from a stated stage.

    Order on the day of judgments.423(1)(b) CrPCs.537 CrPC
  2. 2
    Chief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate)

    Retrial before the Magistrate

    The Magistrate repeats only the stages ordered, then gives a fresh judgment. That judgment can again be appealed to the Sessions Judge within thirty days.

    3-9 monthss.423 CrPCs.408 CrPC

Where it ends up: The case returns to the Sessions Judge on a fresh appeal if either side is dissatisfied.

Leave to appeal · Sessions Judge → High Court Division → Appellate Division

Can the case reach the Appellate Division?

  1. 1
    Appellate Division of the Supreme Court

    Criminal petition for leave to appeal

    After the High Court Division decides a revision, the losing side may file a criminal petition for leave to appeal in the Appellate Division within the time allowed by its Rules. Leave is granted only where a substantial question of law or a grave miscarriage of justice is shown, which is rare in electricity theft prosecutions.

    1-2 yearsArticle 103 ConstitutionSupreme Court of Bangladesh (Appellate Division) Rules 1988

Where it ends up: The Appellate Division's decision is final and binds all courts.

Alternative route · Utility office → BERC → High Court Division

Can the disconnection itself be challenged by writ?

  1. 1
    High Court Division

    Writ petition after BERC

    Section 18(2) bars ordinary courts from ordering reconnection, and the High Court Division normally expects the BERC route to be used first. A writ under Article 102 remains possible where the licensee acted without lawful authority, ignored the procedure, or BERC failed to act, but disputed facts about theft are not decided in writ proceedings.

    Weeks for interim relief; 6 months to 3 years to final hearingArticle 102 Constitutions.18(2) Electricity Act 2018s.40 Bangladesh Energy Regulatory Commission Act 2003

Where it ends up: Interim reconnection may be ordered on conditions; the theft allegation itself is left to the criminal court.

Lower court to higher court

How the electricity theft case in Bangladesh moves up the court hierarchy

An electricity theft case in Bangladesh begins outside court, with the distribution licensee. Its engineers inspect, disconnect and assess, and for a first offence they can settle on payment of three times the value without any case being filed. Executive Magistrates running mobile courts can punish scheduled offences on the spot, but only on a confession and up to two years.

Otherwise the case belongs to the Magistrate courts: s.49 of the Electricity Act 2018 assigns every offence under the Act to a first class Judicial Magistrate or a Metropolitan Magistrate, whatever the value involved, and only a complaint by an authorised engineer can start it. Appeals from a conviction go to the Sessions Judge, or the Metropolitan Sessions Judge in Dhaka, who rehears facts and law. Mobile court sentences go first to the District Magistrate and then to the Sessions Judge.

The High Court Division sits above in revision, looking at law and procedure, and the Appellate Division hears cases only by leave. Billing disputes run separately to BERC.

  1. Appellate DivisionAppellate Division of the Supreme Court
  2. High Court DivisionHigh Court Division
  3. Appellate levelMetropolitan Sessions Judge's Court, Dhaka
  4. First instanceChief Metropolitan Magistrate Court, Dhaka (Metropolitan Magistrate)
  5. Start · outside courtConsumer's premises (inspection and mobile court) · Distribution licensee office (DPDC, DESCO, BREB, BPDB) · Bangladesh Energy Regulatory Commission
Courts & addresses

Where your case is heard

Addresses are for Dhaka. Every district has equivalent courts at its own district judgeship.

Appellate Division

Supreme Court of Bangladesh (Appellate Division and High Court Division)

Supreme Court of Bangladesh, Shahbag, Ramna, Dhaka-1000

Hears appeals, revisions, references, writ petitions under Article 102, company matters and death references (High Court Division), and appeals by leave from the High Court Division (Appellate Division).

Both Divisions sit in the Supreme Court complex; many High Court Division benches sit in the Annex Building. Check the daily cause list for the bench and court room. Postal contact is the Registrar General, Supreme Court of Bangladesh, Ramna, Dhaka-1000.

Appellate level

Court of the Metropolitan Sessions Judge, Dhaka

40-45 Johnson Road, Dhaka-1100

Tries sessions-triable offences from Dhaka metropolitan police stations and hears criminal appeals and revisions from Metropolitan Magistrates; Additional and Joint Metropolitan Sessions Judges also sit as Metropolitan Special Tribunals.

The Metropolitan Sessions Judge sits on the 2nd floor of the main building; Additional and Joint Metropolitan Sessions Judge courts are in the main building and the tin-shed building in the same compound. The Metropolitan Sessions Judge, Dhaka also holds the post of Senior Special Judge, Dhaka. Help line published by the court: 01335-145002.

First instance

Chief Metropolitan Magistrate Court, Dhaka

19 Johnson Road, Dhaka-1100

Takes cognisance of and tries criminal cases arising in Dhaka Metropolitan Police areas (Metropolitan Magistrate courts), hears bail, remand and FIR/complaint matters, and sends sessions-triable cases to the Metropolitan Sessions Judge.

Metropolitan Magistrate courts are spread over the CMM court main building (floors 2-9) and the CJM court building (courts 29-37 on the 8th and 9th floors). Check the court number on the cause list. Each metropolitan city (Chattogram, Khulna, Rajshahi, Sylhet, Barishal, Rangpur, Gazipur) has its own CMM court.

Start · outside court

Consumer's premises (inspection and mobile court)

Where this happens depends on your district or the office concerned. Ask us for the exact courtroom and address.

Start · outside court

DPDC and DESCO customer and division offices, Dhaka

DPDC or DESCO office for the area where the premises is supplied, Dhaka (no single address)

The offices of Dhaka Power Distribution Company (DPDC) and Dhaka Electric Supply Company (DESCO) inspect connections, assess bills for unauthorised use, agree settlements and restore disconnected supply under the Electricity Act 2018 and their supply rules.

Go to the office of the company that supplies the premises; the account number on the bill shows which one. DPDC: https://dpdc.gov.bd; DESCO: https://desco.gov.bd. Keep copies of the inspection report and any bill or settlement you sign.

Start · outside court

Bangladesh Energy Regulatory Commission (BERC)

Kawran Bazar, Dhaka

Licenses and regulates the electricity, gas and petroleum sectors, sets tariffs and resolves disputes between licensees and consumers under the Bangladesh Energy Regulatory Commission Act 2003.

The official website could not be reached when checked, so the address was not verified. Check the current address before visiting.

Indicative timeline

How long each stage takes

These are indicative ranges based on typical Dhaka practice. Adjournments, case backlogs and appeals can stretch them.

Inspection and disconnection
0–0.5 months
Settlement or mobile court
0–1 months
Complaint and appearance
1–4 months
Trial before the Magistrate
8–30 months
Dues, reconnection and disputes
0.5–6 months
Dark bar = faster cases · light bar = slower casesFirst-instance journey: 9.5–41.5 months · Overall: Settlement and reconnection: days to weeks. Contested prosecution before a Magistrate: roughly 1-3 years in Dhaka. Appeal or revision: 6 months to 2 years more (indicative ranges based on typical Dhaka practice)
Prepare

Documents checklist and key terms

Tick off what you have. Your ticks stay saved in this browser. Bring the list to your first meeting with your lawyer.

Licensee
A company licensed under the BERC Act to generate, transmit, distribute or supply electricity, such as DPDC, DESCO or BREB.
Electricity theft
Under s.2(12) of the Electricity Act 2018, taking an illegal connection and consuming or using the electricity.
Meter tampering
Damaging a meter, altering its index or obstructing its registration, an offence under s.38 of the Act.
Three-times settlement
The first-offence option under s.48(1) to pay three times the value of the electricity, plus fees, so the licensee need not file a case.
Compoundable offence
An offence the parties can settle in court with the result of an acquittal; under the Act this covers ss.32, 34, 36, 37 and 40.
Mobile court
An Executive Magistrate's on-the-spot court under the Mobile Court Act 2009, which can convict only on a confession and sentence up to two years.
Public demand
A sum recoverable through the Certificate Officer under the Public Demands Recovery Act 1913, as electricity dues are under s.54.
BERC
The Bangladesh Energy Regulatory Commission, which resolves supply and billing disputes between consumers and licensees.
Questions

Electricity theft case in Bangladesh: common questions

Who can file an electricity theft case in Bangladesh?
Only a licensee's Assistant Engineer, Assistant General Manager or officer of equal rank who has been authorised by the licensee. Section 47 of the Electricity Act 2018 bars any court from taking cognizance on anyone else's complaint, so the case cannot proceed on a police FIR, even though the offences are cognizable, and a private neighbour cannot file it.
Can I avoid a case by paying?
For a first offence, yes, if the licensee agrees. Under s.48(1) you pay three times the value of the electricity taken, the meter cost and disconnection and reconnection fees, and the licensee may then choose not to file a case and may reconnect within 48 hours of payment. The concession is not available for a second offence.
Is electricity theft bailable?
It depends on the section. Theft under s.32 is bailable and compoundable. Installing a bypass device under s.33 and tampering with or bypassing a meter under s.38 are non-bailable and non-compoundable. Bail is still often granted for these, but it is at the court's discretion.
What is the punishment for electricity theft?
Up to three years' imprisonment, a fine of twice the value of the electricity or Tk 50,000 for domestic use (Tk 5 lakh for industrial or commercial use), or both. A repeat conviction attracts double the punishment, and the fine does not cancel the duty to pay compensation and dues.
The illegal line was put in by my landlord. Am I liable?
Section 33(2) presumes the occupier of a dwelling responsible where a bypass device is proved, unless the contrary is shown. A tenant can rebut it with the tenancy agreement, evidence of who controls the wiring and meter, and payment records. Raise this early, at settlement and in any discharge application.
Can a court order my power to be reconnected?
Not an ordinary court. Section 18(2) bars any court from ordering reconnection of a supply cut under s.18. The licensee must reconnect once the prescribed conditions are met, and BERC can deal with unreasonable refusals. A writ in the High Court Division is a last resort where the licensee acted without lawful authority.
Where do I appeal a conviction?
A Magistrate's conviction is appealed to the Sessions Judge, or the Metropolitan Sessions Judge in Dhaka, within thirty days, excluding copying time. A mobile court sentence goes first to the District Magistrate and then to the Sessions Judge, and is limited to the extent or legality of the sentence.
How long does an electricity theft case in Bangladesh take?
A settled first offence can be closed within days or weeks. A contested prosecution before a Magistrate commonly takes one to three years in Dhaka, and an appeal or revision can add six months to two years. These are indicative ranges based on typical Dhaka practice.

Law and sources

  1. Electricity Act 2018 (Act 7 of 2018), consolidated text, Laws of Bangladesh mirror
  2. Electricity Act 2018 — Laws of Bangladesh
  3. Bangladesh Energy Regulatory Commission Act 2003 — Laws of Bangladesh mirror
  4. Mobile Court Act 2009 — Laws of Bangladesh
  5. Code of Criminal Procedure 1898 — Laws of Bangladesh
  6. Public Demands Recovery Act 1913 — Laws of Bangladesh mirror
  7. The Constitution of the People's Republic of Bangladesh (Articles 102, 103, 105)

This Case Journey is a general guide to procedure in Bangladesh as of October 2026. It is not legal advice. Procedure, fees and time limits change, and every case turns on its own facts. Timelines are indicative. Speak to a lawyer about your own matter.

Living abroad?

Run this case from outside Bangladesh

You can usually start and run this case without travelling. You sign a power of attorney abroad, the Bangladesh High Commission or Embassy attests it, and your attorney and lawyer act for you in Dhaka. Some steps, such as giving evidence in person, may still need you or a commission. See how a case runs through a power of attorney →

Your case, mapped by a lawyer

Want to know where your case stands?

Book a consultation. A TRW lawyer will place your matter on this map, explain the next step and the realistic timeline, and tell you what to prepare.

Call the Dhaka office+880 1708 000660WhatsApp · message usMessage our team
Message TRW on WhatsApp